انتشار Service Pack 1 پراجکت سرور 2013 و مایکروسافت پراجکت 2013

clip_image001[90] Certain tasks with very high work loads cannot be viewed in the Approval Center

clip_image001[91] If a project with subprojects is opened before it is completely saved on the server, it may become corrupted

clip_image001[92] Deleting a project created from the Project Ideas list can fail if the Project Ideas list was deleted

clip_image001[93] In some cases, time phased cost and work values entered for a baseline in Project do not properly appear in the reporting database

clip_image001[94] At a high DPI setting, the view names displayed on the left side of the screen may not appear correctly

clip_image001[95] Users cannot edit a task’s work or remaining work in the Schedule Web Part when Protected Actuals is enabled on the server and the task already has actual work

clip_image001[96] Out-of-the-box Project web parts do not function outside of the Project Web App site collection

clip_image001[97] Resource costs are not calculated correctly when using the project update PSI for assignments that contain multiple cost rate table entries

clip_image001[98] When projects are created in PWA using template-based EPTs, notes that are associated with tasks are lost when the project is opened in the Project client

clip_image001[99] Project shows the error “The following job failed to complete Job Type: Save Error ID: 9000(0×2328)” when attempting to save changes in enterprise projects with more than 5000 tasks

clip_image001[100] If the user selects one (or more) cells and then right-clicks in a cell that requires the grid to scroll, the right-click selection is lost

clip_image001[101] When Project CSOM is used to return the collection of projects, the collection will now include subprojects

clip_image001[102] If a textbox is added to a Gantt chart with a number in front of the text, the number shows up after the text in printing/print preview

clip_image001[103] The Import Timesheets feature does not work properly when the language setting is not English

clip_image001[104] If the Gantt chart is split with the resource graph view, Project may crash when the bar styles for the resource graph are edited

clip_image001[105] When a baseline is saved from the context of a Master Project, Project may crash unexpectedly

clip_image001[106] The number of calendar exceptions allowed for a single entity in Project has been increased

clip_image001[107] The main Project icons will now be displayed correctly at a high DPI setting

clip_image001[108] Project may not show the baseline data correctly if time phased baseline work and/or baseline cost is edited

clip_image001[109] Baseline Work calculations sometimes do not update correctly while the user is in the Resource Usage view

clip_image001[110] The Previous, Next and Select Period buttons are now enabled so that the user can move to a different period where there is an active time period

clip_image001[111] When leveling granularity is set to a value greater than Days (Weeks and Months, for example), leveling does not properly resolve over allocation issues

clip_image001[112] Saving and publishing a project on Project Server may take a long time

clip_image001[113] Publishing a project, when resources in the project have assignments in many other projects, may take a long time to complete

clip_image001[114] If the Office-wide profile setting turns off saving to either XPS or PDF, then the Project Save As dialog may not work correctly

clip_image001[115] Earned value calculations do not work correctly in Project when any baseline other than Baseline0 is used

clip_image001[116] Time phased Actual Cost and Baseline cost may not properly appear in the reporting database if there’s no associated time phased work/baseline work with the cost

clip_image001[117] On some assignments with modified contours and small assignment unit values, it’s not possible to set the % Work Complete field to 100%

clip_image001[118] Tasks deleted using the Gantt view on a SharePoint list do not go to the Recycle Bin of that site

clip_image001[119] CustomFieldValueListAdd method cannot write values over 127 characters long

 

کلمات کلیدی : پراجکت سرور 2013 ، پروجکت سرور 2013 ، راهکار مدیریت پروژه سازمانی ،‌ EPM 2013 ، Enterprise Project Management 2013 ، آموزش پراجکت سرور 2013 ،‌ آموزش پروجکت سرور 2013 ،‌ آموزش Project Server 2013 ، مایکروسافت پراجکت 2013 ، ماکروسافت پراجکت 2013 ، مایکروسافت پروجکت 2013 ، ماکروسافت پروجکت 2013 ، Microsoft Project 2013 ، آموزش نرم افزار کنترل پروژه ،‌ آموزش Microsoft Project 2013 ،‌‌آموزش مایکروسافت پراجکت 2013 ،‌‌‌ آموزش ماکروسافت پروجکت 2013